Following up
Running to catch up to the requests for Lime Plaster Mantels interest. BUILDEX was a fun show since it comes and goes so fast. Two day set up, 2 day show and take it down... then run to catch up to the work that you put on hold during the show!
One of the fun features of our booth was having a 'concrete wall' which was not concrete.
KCC 2011 is the a fantastic finish for the look and feel of concrete, without the weight.


The offer was open to the visitor in the booth to 'Touch Me' - the walls that is!



Comments
Post has no comments.